Close
Showing results 1 to 10 of 66

Threaded View

  1. #11

    Default

    I ordered a Corsair Professional Series AX 1200 Watt Digital ATX/EPS Modular 80 PLUS Platinum and an Intel i7-4930K LGA 2011 today ($900 ouch!) In two weeks (payday!) I'll order memory, a cooler and another GTX 670 (4GB). That only leaves the MB.

    When you (MiRai) say "end of this month" do you mean the end of October? In that case, I'll wait until the end of October to order the Asus RIVE Black to build the new computer.
    Last edited by Khatovar : 10-05-2013 at 01:29 AM Reason: stripped font/color

Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •